# | Title | Electoral Area | Road Classification | Contractors Name | Asset Type | Work Description | Status of Works | Estimated Area of Works | Final Actual Area | Start Date | Completion Date | Roads Listing | Surface Type | Re-Surfacing Materials | Final Cost | X Co-ordinate | Y Co-ordinate | Item Type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Emmet Road | South Central | Traffic Impact 4 | — | Roadway | Repair and Resurface Carriageway | Planned | 11300m2 | — | — | — | EMMET ROAD INCHICORE DUBLIN 8;#1384 | Bituminous;#2 | Bituminous;#2 | — | 312687107.67 | 233567018.08 | Item |
2 | Morehampton Road (between Appian Way and Herbert Park) | South East | Traffic Impact 4 | — | Roadway | Reconctruct and Resurface | Planned | 7000m2 | — | — | — | MOREHAMPTON ROAD DONNYBROOK DUBLIN 4;#2609 | Bituminous;#2 | Bituminous;#2 | — | 317095385.49 | 232137495.09 | Item |
3 | Leeson Street Upper | South East | Traffic Impact 4 | — | Roadway | Reconstruct and Resurface | Planned | 6000m2 | — | — | — | LEESON STREET UPPER DUBLIN 4;#2266 | Bituminous;#2 | Bituminous;#2 | — | 316590114.45 | 232456219.86 | Item |
4 | Rathgar Rd and Rathmines Rd Lwr | South East | Traffic Impact 4 | — | Roadway | Reconstruct and Resurface carriageway | Planned | 24678m2 | — | — | — | RATHMINES ROAD LOWER RATHMINES DUBLIN 6;#3120;#RATHGAR ROAD RATHGAR DUBLIN 6;#3113 | Bituminous;#2 | Bituminous;#2 | — | 315552139.1 | 231516006.72 | Item |
5 | Harcourt Road | South East | Traffic Impact 5 | — | Roadway | Reconstruct and Resurface carriageway | Planned | 2517m2 | — | — | — | HARCOURT ROAD DUBLIN 2;#1887 | Bituminous;#2 | Bituminous;#2 | — | 315720729.05 | 232759981.02 | Item |
6 | Mount Street Lwr (between Merrion Square East and Warrington Place) | South East | Traffic Impact 4 | — | Roadway | Reconstruct and Resurface carriageway | Planned | 5825m2 | — | — | — | MOUNT STREET LOWER DUBLIN 2;#2644 | Bituminous;#2 | Bituminous;#2 | — | 317060470.42 | 233446311.67 | Item |
7 | Williams Park | South East | Traffic Impact 1 | SM Morris Ltd | Roadway | Reconstruction and Resurfacing of carriageway | Planned | 700m2 | — | 2011-02-04T00:00:00 | 2011-02-04T00:00:00 | WILLIAMS PARK RATHMINES DUBLIN 6;#4056 | Bituminous;#2 | Bituminous;#2 | €20,878.33 | 315576579.66 | 231924513.12 | Item |
8 | Connolly Avenue | South Central | Traffic Impact 1 | — | Footway | Concrete Footpath Reconstruction and macadam around the trees. | Planned | 400m2 | — | — | 2011-10-05T00:00:00 | CONNOLLY AVENUE INCHICORE DUBLIN 8;#966 | In Situ Concrete;#1;#Bituminous;#2 | In Situ Concrete;#1;#Bituminous;#2 | €24,272.74 | 312333135.3 | 233329761.82 | Item |
9 | Ramps | — | — | — | Traffic Calming Measure | Replacement of Red printed asphalt ramps with black asphalt ramp. | Planned | 4087 m2 | — | — | — | — | Bituminous;#2 | Bituminous;#2 | — | — | — | Item |
10 | South East Local Roads Contract 1 | South East | Traffic Impact 1 | SM Morris Ltd | Roadway | Resurfacing of Zion Rd and Winton Road. | — | — | — | — | — | ZION ROAD RATHGAR DUBLIN 6;#4136;#WINTON ROAD RANELAGH DUBLIN 6;#4087 | Bituminous;#2 | — | — | — | — | Item |
11 | Surface Water Drainage North Central, Central,North West | North West | Traffic Impact 5 | KN Network Services | Footway & Roadway | Install Surface Water Gullies at 6No. Locations throughout The Northside of Dublin City | Complete | N/A | N/A | 2011-08-03T00:00:00 | 2011-03-29T00:00:00 | CAMPBELL'S COURT SMITHFIELD DUBLIN 7;#609;#GRANGE ABBEY ROAD DONAGHMEDE DUBLIN 13;#1723;#GRANGE PARK CRESCENT RAHENY DUBLIN 5;#1729;#THORNVILLE ROAD KILBARRACK DUBLIN 5;#3851;#TONLEGEE ROAD COOLOCK DUBLIN 5;#3867;#SWORDS ROAD SANTRY DUBLIN 9;#3720 | Bituminous;#2;#Grass;#10;#In Situ Concrete;#1 | Bituminous;#2;#Grass;#10;#In Situ Concrete;#1 | €23,217.23 | — | — | Item |
12 | North Central & North West Asphalt Ramp Contract | Northside | Various | Sierra Communications Ltd | Traffic Calming Measure | Resurface and reconstruct 59 locations throughout the Northside of Dublin City | Planned | 1380 square metres of 35mm deep resurfacing, 434 square metres of 100mm deep reconstruction, 795 square metres of 300mm deep reconstruction. | TBA | 2011-05-25T00:00:00 | — | — | Bituminous;#2 | Bituminous;#2 | — | — | — | Item |
13 | South East Local Roads Contract 2 | South East | Traffic Impact 2 | — | Roadway | Repair and resurfacing of Roads in the South East Area | Planned | 15916 | — | — | — | GILFORD ROAD SANDYMOUNT DUBLIN 4;#1613;#PARK AVENUE SANDYMOUNT DUBLIN 4;#2895;#CHURCH AVENUE RATHMINES DUBLIN 6;#798;#BELGRAVE SQUARE WEST DUBLIN 6;#354;#BELGRAVE SQUARE SOUTH RATHMINES DUBLIN 6;#353;#BELGRAVE ROAD RATHMINES DUBLIN 6;#350;#CHURCH GARDENS RATHMINES DUBLIN 6;#801 | Bituminous;#2 | Bituminous;#2 | — | — | — | Item |
14 | South Central Area Asphalt Contract | South Central | Traffic Impact 2 | — | Roadway | Reconstruct and Resurfacing of roads in the South Central Area. | Planned | 8101 | — | — | — | CLAREVILLE ROAD HAROLD'S CROSS DUBLIN 6W;#879;#LARKFIELD PARK KIMMAGE DUBLIN 6W;#2242;#PRIORY ROAD HAROLD'S CROSS DUBLIN 6W;#3044;#MOUNT ARGUS ROAD HAROLD'S CROSS DUBLIN 6W;#2625;#LARKFIELD AVENUE KIMMAGE DUBLIN 6W;#2239 | Bituminous;#2 | Bituminous;#2 | — | — | — | Item |
15 | Mount Street Lwr | South East | Traffic Impact 4 | — | Roadway | Asphalt Reparins and Resurfacing Works | Planned | 6625m2 | — | — | — | MOUNT STREET LOWER DUBLIN 2;#2644 | — | — | — | 317060470.42 | 233446311.67 | — |
16 | Ramps | — | Various | — | Traffic Calming Measure | Resurface andReconstruct Traffic Calmong Features | Planned | 2,011m^2 of 35mm resurfacing 1,922m^2 of 50mm Geogrid resurfacing 30m^2 of 100mm Reconstruction 89m^2 of 500mm deep Reconconstruction 46No. Geo Reference Locations | TBA | 2012-04-23T00:00:00 | — | — | — | — | — | — | — | — |
17 | South East Asphalt Contract | South East | (None) | — | Footway & Roadway | Asphalt repairs and Resurfacing on Bull Alley St, The Appian Way, Bushes Lane /Grosvenor Villas and Fortfield Gardens/Fortfield Terrace. Concrete footway repairs on Fortfield Gardens and Fortfield Terrace. Concrete carriageway repairs on Bushes Lane. Concrete channel construction on Bushes Lane. | Underway | 7795m2 | — | 2012-10-04T00:00:00 | — | — | — | — | — | — | — | — |
18 | North Central Footpath Contract 2012-1 | North Central | Traffic Impact 3 | — | Footway | Localised footpath repairs from hazard register database | Planned | 2615msq footpath reconstruction in localised patches, Scabbler repairs 329m, 4.5msw concrete carriageway reconstruction, reconstruction of tactile repairs 21msq | — | — | — | — | — | — | — | — | — | — |
19 | California Hills Fencing Contract | South Central | Traffic Impact 4 | — | Retaining Wall | Reinstatement of fence alont the Kylemore Rd and Chapelizod By Pass. | Planned | 371.5 linear metres | — | — | — | — | — | — | — | — | — | — |
20 | Ramps | South East & South Central | Various | — | Roadway | Resurfacing of ramps in the South East and South Central Areas | Planned | 1428m2 in SC Area 2210m2 in SE Area | — | — | — | — | — | — | — | — | — | — |
21 | Ushers Island and Victoria Quay footpath reconstruction | South Central | Traffic Impact 5 | — | Footway | In -situ Concrete footpath reconstruction | Planned | 1367.35m2 | — | — | — | — | — | — | — | 314288.98 | 234259.74 | — |
22 | South Quays | — | Traffic Impact 5 | — | Footpath Reconstruction | Reconstruct concrete paving slabs | Planned | 1200m2 | — | — | — | — | — | — | — | — | — | — |